What are the components of the spare parts management solution? Design and implementation
RFID Knowledge

What are the components of the spare parts management solution? Design and implementation

PublishedShanghai Zejie Smart Technology Co., Ltd.

The spare parts management of the spare parts is to choose between “form-standardized processes” and “building systems integrated management”, the quantity of critical materials, access frequency, shutdown risk and existing data quality. Solutions typically include classification codes, demand plans, procurement and warehousing, inventory control, access backtracking, inventory and system implementation; the more complex the management is, the more the process needs to be designed with data.

Cost: Table or system management

The table is less directly inputable, suitable for the type of material, less frequent access to the library, and a few people manage the scenes, but it is important to arrange for personal maintenance of coding, inventory and access records. As the warehouse increases, equipment or access personnel, repeated entry and information not synchronized increases management costs. System construction requires input into software configuration, data collation, process adjustments and training, which should be evaluated with subsequent maintenance combined with staff time, rather than just comparing procurement costs.

Effects: Stock or complete process only

Only the amount of inventory is recorded, and answers to “the number of items on the account” do not necessarily indicate which equipment the material corresponds to, why it was received or when it was replenished. A more complete solution starts with material master data, clear names, specifications, units, codes, applicable equipment and storage locations, connections to procurement requests, revenue banks, access to refunds, transfers, inventories and scrap records. Different controls can be set up depending on material importance: Key spare parts record equipment suitability and replacements, common items focus on the lower limit on the inventory, low-frequency materials focus on checking the procurement cycle and availability.

Inventory parameters should be set in conjunction with actual consumption and replenishment time. The safe stock is a buffer against fluctuations in demand or delays in delivery; the recharge point is usually determined on the basis of projected consumption during the replenishment cycle, together with a secure inventory. Parameters cannot be replicated over the long term: Regularly planned consumption and actual access can be compared, missing items checked, backlogs and emergency procurement records are adjusted. Shanghai-based Scientific, while combing such management options, can place process, material data and inventory rules within the same design, avoiding system uplined reliance on an underline form to refill.

Application scenario: selection of options by management complexity

Single warehouses, with few materials and simple units, can first harmonize the code, access library documentation and inventory cycle, then assess whether systems are needed; multiple warehouses, multi-equipment, cross-class take-over or critical stop-off spare parts are more appropriate to use unified desk and authority management, and keep a record of each receipt and issue. A sample of material is available before selection, verification of consistency in name specifications, conformity of accounts, availability of access back to equipment or worksheets, which will better reflect management needs than the total number of statistical items.

Common pits: go online without a rule.

Common problems include multiple calls for the same material, inconsistent units of measurement, unjustified floors and floors on inventory, and inconsistencies between system processes and field operations. Implementation can be extended by checking differences by "take-cleaning data -- determine coding and permissions -- configure process and parameters -- small scale test-run". Online, you should identify who maintains the master data, who approves them and how often do you count them; check the accounts after the line, the number of missing items and the stag. These indicators are used to determine the short panel, then decide whether to use a table, system or stage.