What is the value of space asset management systems? Space utilization and occupancy analysis
The core value of SAS is to turn "sensor-to-the-touch" into "data-to-manage." When the enterprise works, conference rooms, storage spaces, equipment cabinets and so forth, it can no longer be sustained by Excel and experience -- re-use rates are unclear, idle costs are unknown, expansion or contraction determinations are incorrect. The system essentially provides a dashboard for space resources, with two core indicators of occupancy and utilization: "Who is working, how much is spent, whether waste is wasted."
Value positioning. Three signals to go.
The decision to go on space asset management systems would allow three signals to be read first, without rushing to target others.
The first signal is...The scale of resources goes beyond the artificially manageable boundaries.. A business with 50 workstations can get by with Excel. One with 500 workstations or multiple sites cannot. We worked with a precision manufacturer with four plants and more than 3,000 workstations and storage locations. Routine stocktaking alone took two weeks, before any analysis. At that scale, without a proper system, unclear records lead to poorly informed decisions.
The second signal is...Space-related costs as a proportion of the totalThe costs of office rent, equipment rooms and storage space combined often range from 15 to 30 per cent of the operating cost. If "the space is empty for long" is not known, the money goes off quietly.
The third signal is...Business changes are fast enough to keep up with space adjustments.The "dynamic" movement of space in this scenario is more critical than "static distribution." The system can reduce the time for adjustment from days to hours, with a completely different response capacity.
Space utilization -- indicators to be counted on three levels
The use factor looks simple, and it's a lot of things. The most common error is to take the "total number of places in the register" as a utilization factor -- so that the numbers are pretty, but they don't reflect the real situation. Staff travel, field missions, long leave, seating but not "used," space is not reused where it really needs to be.
A really useful algorithm requires superseding time dimensions, usually three layers:
- Level:All available places, week or month.
- Regional level:Average utilization per floor, area and area, identifying long-term low-level blocks
- Timescale:Disparities are used in morning, afternoon and evening to identify the valley.
A R&D-based enterprise once found that 78% of the combined monthly utilization rate was good. But open up, R&D areas often breach 90% on Tuesdays and Wednesdays, while administrative areas account for more than 40%. The reason is not that there are enough jobs, but that there are no subdivisions or functions that match, and it solves the problem by adjusting the floors to their location.
The average reasonable use of office space is between 60 and 80%, more than 85% of which indicates a space-strained situation, less than 50% of staff experience shows that there is a clear waste. But different benchmarks for research and development and passenger service are the ones that guide differential design.
Occupancy analysis. Three dimensions determine whether it works.
Many systems show "what rooms are being used" and this is only a primary function. The real value of the occupancy analysis is three questions.
First, who is keeping the resources for a long time.For example, a storage space is registered under a project but there's no access to the library for three months in a row -- "Zombie Occupancy." Released to a real-use team and resources are running.
Second, the match between space and operational activities.Sales require a large number of face-to-face conference rooms, research and development requires quiet stand-alone work, and transport requires close proximity to the room.
Third, the recognition of hidden waste.The two-storey office space is run by a single floor, the conference room is empty because of the long-term "porting" of individual departments and the absence of an appointment mechanism for visitors. These details are not available to Excel, but the system's sensor data and booking records can be captured.
Our approach is to suggest that clients run a round of "diagnosis reports" and mark first the three types of problems: zombie occupation, misalignment areas, and inefficient time periods. In most projects, a few high- or low-use issues contribute to significant cost recovery.
From data to decision-making -- the system has to support these four things.
The system is a tool and the decision chain is at its core. A qualified space asset management system supports at least the following actions.
Real-time visualization is the bottom line.The manager opens the board to see real-time occupancy in all regions, historical trends and extreme fluctuations. When Shanghai-based Technology Ltd. delivers a project, it makes a configurable viewer of each type of space resource core indicator, allowing administrative, IT, business parties to see what they care about, and avoid a report that serves all scenarios.
Data deposition is used for planning.How many new jobs this year, whether to expand the rent next year and which parks can be merged – these judgements cannot be felt any more. The system has at least 12 months of data to make trend analysis meaningful.
The appointment process is as light as possible.The system that employees want to use is the data. It's too cumbersome to approve, and you'll go around the system and go on with Excel, and it's "system-ready, but the data is empty."
Cost-related links can be traced retroactively.Each type of space resource is tied to a cost centre to know which sector is used for no value. This is also the essential difference between management of space assets and traditional property management — the latter merely "no" and "no" in the former.
Common error areas in operation - these pits avoided earlier
Most of the failures in space asset management systems are similar, and four lessons have been learned.
Don't go up and pursue full coverage.The first one is a park, and the first one is a resource run-through process that defines indicators, collects them, and the board is logical and then extends horizontally.
Sensors and software must be planned simultaneously.The software is not equipped with sensors, the data is filled manually for a rate of not more than two months; hardware is set up without analysis. Two legs walk together to go far.
There should be clear organizational responsibility.Space management cuts across administrative, IT, finance and operational departments, and without a lead person, it is "whoever takes care of what they do".
Too many indicators.Frontline staff won't remember or use them. Limit core metrics to five and derived metrics to no more than 15. Beyond that, they become window dressing.
Back to decision-making itself
The SAS system is not a "pay-for-all" tool, but a "make space decision" tool. If you're facing an inadequate number of jobs, the cost of expansion is unclear, and it's one of three types of problems that will make it difficult to decentralize the campus, the rate of introduction is worth it. If you just want to do more precision on the "space management" thing, you can pilot it from a park, a kind of resource, and then decide whether to expand it after three months.
Data are part of the answer. Space is not how much it costs, but how much it saves, how much it increases, and how short the decision-making cycle is. With these three numbers, the SAS system really works.

Ms. Lei
Mr. Pang