Visualized asset management system? Viewboard indicators and spatial viewing
RFID Knowledge

Visualized asset management system? Viewboard indicators and spatial viewing

PublishedShanghai Zejie Smart Technology Co., Ltd.

Visualized asset management system panel indicators and spatial views are not a relationship. The board looks at numbers that are abnormal, the space view is looking at physical locations and asset lines. Tie them to the same asset master data so that figures can be documented and tracked.

Watch the panels and space views. What are the problems?

The division of labour between the two is to be seen in the same table:

Dimensions Watch the tablets. Space View
Questions answered How much, what, is it abnormal? Where, who's using, how are they moving?
Information Form Numbers, thresholds, trend lines Plane, bits, heat distribution
Typical Use scene Monthly inventory, protection alerts, idle ratio analysis Inspection location, emergency movements, space utilization analysis

In practice, panels and spatial views are often the same two ways of presenting an asset card -- a dot-on card that can jump to the indicator page and get to its location on the map. Shanghai-based Cheeky Way Technologies usually advises that this layer of connection is made when they are institutionalized for manufacturing-sector customers, or else it becomes easy to turn into two sets of discrete data.

See how the tablets are set.

The most problematic part of the board is a pile of indicators, but no one knows what to do with a number abnormal.

First tier: totals and structure

The total number of assets, usage, idle numbers, and amount to be written off. This level answers "How much is on the books", which is usually enough for a monthly update before the meeting.

Second level: use and flow

Use rate, turnover rate, number of transfers across sectors. This layer reflects whether assets are actually used. For example, after a factory that does warehousing logistics mentioned forklift usage from 42% to 68%, it reduced the following year by 4 purchases and saved about $600,000 on a single channel of $150,000 (data source: internal client measurements, 2023).

Level three: anomalies and alarms

The protection is due, depreciation is due, the period is not used, the location signal is lost. This layer must be accompanied by a threshold and a warning rule, but the threshold cannot be cut across -- office computers are not red for 30 days, and spares on production lines are normal for 60 days.

How do you use space view to be valuable?

Space view is not just a drawing of the plan, but focuses on both "location" and "motion".

Bottom Chart and Coordinate System

The bottom map can be used for CAD maps, floor plans, or plant satellite maps, the key is to give a single code to each space, like "Workshop A-3 Area-B Axe." Assets are on this code so that they can be located in the view, otherwise the point will drift.

♪ The wiring and the heat to try ♪

Assets with RFID or positioning tags can draw the last week's movement trajectory on a plan. Hot-tips are suitable for analysing areas where unused materials are stored over time -- a retail door store that tries to find 30% of shelf long vacant west of the warehouse, re-programming and releasing about 12 square metres of active area.

Connect to the board.

In a space view, you can see the list of assets and key indicators in this area, and vice versa. The board entry point for idle devices Top10 shows which floors they're scattered. The layer is not working well, and both views are just set up.

Different asset types, how to focus?

Not all assets require a similar level of panel + spatial view configuration, which can be inputd by type:

Common pits.

Main data is missing.

This is the most common problem. The "inactive devices" in the panel and the "grey spots" in the space view are actually the same assets, but not the same because of the code rules. The system has to take time to harmonize the asset codes before it goes online, otherwise the back-to-back costs are much higher than the previous processing.

View Update Delay

The location of the assets in the space view is updated manually by entering or swipe, and the frequency of the update does not keep pace with actual changes. It is recommended that each asset transfer triggers a place update instead of being saved for one-time entry at the end of the month, otherwise the view and the physical parts will be far from being available.

Only one view

Some teams look on board and think that space view is "funny" and it's only a matter of finding the equipment. Others like space viewing, but ignore the pure number of alarms about depreciation due. Both types of dereliction make the system less valuable.

Summarizing: The board and spatial view are two of the same sets of asset data, not two separate functions. First, the master data and coding rules are clear, then the input ratio of both views is determined by the type of asset, and then they are attached together, so the system can really be used. How the specific indicators fit, how much particle size the view reaches, and it can be adjusted from the actual count results to the full, without having to start with a big, complete search.