What are the functions of the equipment asset management management system? Key indicators and early warning mechanisms
RFID Knowledge

What are the functions of the equipment asset management management system? Key indicators and early warning mechanisms

PublishedShanghai Zejie Smart Technology Co., Ltd.

The conclusions are first put forward.

The thing that the ERM system is going to solve is, ultimately, "the books, find, fix, report" in one line. The core function is mainly on the asset desk, inspection and maintenance, depreciation accounting, positioning four blocks; which key indicators are to be selected for what equipment you handle, and what management stage; what early warning mechanisms are to be done, the threshold values, the responsibility-bearers and the disposal process are not.

The more functional modules the better, the better.

Many teams come up with a full set of features, and the result system becomes a setup. It is more prudent to break down the functionality into the minimum available units and add it up.

Asset desk accountsThis is the bottom of the system. Each device must have a "identity card" to record the name of the device, the specification model, the date of purchase, the original value, the use department, the current state (in use/inactivity/maintenance/end-of-life). If the equipment is purchased from different suppliers, from different batches, the account fields must be harmonized or the subsequent statistics will be confused.

Inspection and maintenanceThe equipment is used, the record is useless. The inspection plan, the maintenance worksheet, the spare parts consumption, the three pieces are complete. Like a retrofit machine, the inspection cycle, the maintenance project, the last time you've been repaired, it's going to be available in the system, or it's too late to flip the account if there's a malfunction.

Depreciation and cost accounting: The most easily decorated reconciliation between finance and equipment management is the depreciation age, the residual value, how maintenance and retrofit costs are accounted for. The system foresees several depreciation methods (lined method, double-deduction method, etc.), supports automatic matching by type of equipment and allows the export of depreciation data to the financial system.

Positioning and InventoryThe device is physical, moving and loss. A bar code or RFID label is placed on each device (a technology that automatically identifies objects by radio wave, simply understood as an electronic bar code), allowing access to information and location with a mobile phone or hand-held terminal scan. At least once a year, the whole plant count is performed, and the difference between the number of books and the actual number is marked in the system.

A few details that are often ignored.

The collateral management (descriptions, warranty, certificate of eligibility, electronicization of the operating manual), the online upswing of borrowing and transfer processes, which are not easy to see, but they depend on them for their accountability. Shanghai-based Cheeky Waytech, Inc., while helping clients with projects, found that a significant proportion of equipment disputes ended in "no original contract or warranty."

Five is enough to sustain day-to-day management without more key indicators.

The core indicators that each enterprise actually uses are usually contained in about five, and the scene is divided into more.

Integrated Efficacy of Equipment (OEE, Overall Evaluation Efficties): A combination of equipment availability, performance crop activity and passivity, reflecting the real level of use of the equipment. The discrete manufacturing industry (independently processed per process, in which final assembly products are produced) generally requires OEE to be no less than 85%, a higher number for continuous production.

Fault failure rate: The failure time as a proportion of the planned time of operation. Early warning is triggered if a threshold is exceeded, depending on the type of equipment and process requirements, with industry experience taking 5%.

Maintenance response time and recovery timeThe time between the reporting and processing, and from the beginning to the repair (the time of repair is commonly used in industry for MTTR, Mean Time To Repair). Open the two, it's clear whether the response is slow or slow.

Spare parts stock turnover rate: How many times a year spare parts have been taken. Too high an indication of the inadequate stock and the low level of maintenance, which means that there is too much pressure. The general turnover rate for spare parts is reasonable from 4 to 6 per year.

Net asset ratio: The current net value as a proportion of the original value reflects the ageing of the equipment. More than 70% means that most equipment is near or past depreciation and renewal is on schedule.

Indicators Application of the focus Common reference threshold
OEE Real-use level of equipment ≥85%
Fault failure rate Stability ≤5%
MTTR Maintenance efficiency By Device
Spare parts turnover rate Inventory health 4-6 times/year
Net asset ratio Ageing 70% of the radium needs attention.

The focus of attention varies from one production line to another, with a single machine bed that values OEE and downtime rates, to the cost of frequency failure and maintenance. These five indicators are configured by type of equipment, which is more effective than uniform requirements.

Early warning mechanisms don't have a threshold to run.

Early warning functions are not functional in many systems, often because they are not technical and do not match thresholds, responsibilities and processes.

What's the threshold?

The threshold is derived from three types of sources: one is the range of parameters given by the plant, such as temperature rises, vibration ranges; two is the industry experience value, such as the 5 per cent failure rate mentioned earlier; and three is the historical data of the enterprise itself, running for more than six months before head-reading. The latter is the closest to reality, but only the first two are available in the short run, then the later.

The early warning level is recommended in three stages: yellow (indicators entering the focus area), orange (indicators breaking the threshold, requiring a time limit), red (involving security or significant loss, responding immediately). Color is not the focus, but it is important that there be different response times.

Responsible persons and response processes

The warning is to whom, who knows, who handles, who closes, and the four steps are to be solidified in the system. Like an OEE drop 80% of the warning should be sent automatically to the workshop director; more than 24 hours without processing should be upgraded to the equipment minister; and more than 48 hours before upgrading to the plant leader. Each level must leave a record of the disposal, including disposal measures and estimated recovery time.

Early warning is not just passive reception, but also voluntary confirmation. The first thing a shift takes place every day is to look at the alert list and clear out old and unrecognized warnings, so that early warning does not accumulate into garbage.

A few of the pits that are easy to step on when you land.

Don't make an electronic version of the system for Excel.. Many projects simply put the forms on line, without a standard field or a bound process. This system is not maintained for six months and turns into a new island.

Run through and optimize.. The first version of the function is as simple as possible, records, queries, and can export a report. Complex functions (data analysis, mobile end approval, AI forecast) are in two, three, or else the go-live cycle is long and user-heavy.

Focus on first-line feedback. Inspectors, maintenance technicians, and workshop managers use the system every day. Their input matters more than management's requirements. A few rounds of UAT (user acceptance testing, in which real users try workflows and flag problems) before launch are more useful than ten rounds of fixes afterward.

Don't be lazy with the initialization of data.The equipment desk account is extremely heavy from zero, but the result of incomplete fields is that the follow-up report is completely incorrect. Shanghai has seen a client case where it took three months for the factory to complete its old equipment data for several years before it actually used the system.

A few concluding suggestions

An equipment asset management system does not deliver results as soon as it is installed. Allow at least three to six months from requirements analysis to live operation. Roll it out in three stages: first establish the register, tags, and basic processes; then start measuring OEE and downtime and collecting maintenance data; finally set up alerts, performance reviews, and continuous improvement. Set a measurable goal for each phase and move on once you meet it.

If there is any doubt about the details of a particular link, it can be done by building on core indicators and early warning mechanisms to see these two modules through, and then consider expanding other functions. The input-output ratio for system construction often appears only in the second and third years.