How do you design the fixed asset management system solution? The scene matches hardware.
The design core of the fixed assets management system is to remove the use scene first and then match the label, capture equipment and software module. The scenario determines how the inventory is taken, which determines how the hardware is selected — both steps are wrong and all functions are to be reset.
Point 1: First, divide the asset management scene into three categories
The focus on fixed assets varies widely from industry to industry, and can be grouped in three broad categories:
- Production categoryThe variety of equipment and the frequency of changes in location, as well as the frequent flow of machine beds, moulds and work kits from different workshops, with a focus on tracking usage records and depreciation calculations.
- Type of institution (school, hospital, government)The assets are spread over multiple buildings, and the accounts are consistent with hard-to-audit indicators.
- Group Multi-organization CategoryCross-city, cross-corporate entities need to be measured by organizational dimensions, allocated, depreciated and a single account is difficult to sustain.
Element 2: Label selection is the starting point for hardware matching
The label determines what equipment to read, and the common three categories have their respective applicable boundaries:
- Bar Code: Individual asset costs can be kept below 1 gross, suitable for low-value, less variable assets such as tables and chairs, document cabinets, with the disadvantage that only one to one scan is available.
- Two-dimensional code.: Information is very large, it can directly encode asset numbers, names, specifications, it costs a few cents per print, and it can be counted with a mobile phone AP, which is the category that is currently more useful.
- RFID Electronic Label: A unit price of US$1–3 and a mass reading (a few dozen to hundreds at a time), suitable for large-scale scenarios such as a container-intensive room, warehouse shelf, medical equipment storage; metal and liquid environments require metal resistant labels.
Element 3: Inventory decision to collect hardware
The scene and tag are set, then the count is clear:
- Handheld PDA Count: Industrial handheld terminal with sweep codes or RFID modules, batteries are renewed for more than 8 hours, capable of cleaning thousands of data and suitable for daily inspection.
- Smart CDI• The integration of UHF RFID readers and antennas in carts, which can read the entire floor along the corridor, fast but at high unit prices (about 2-5 per unit) for a multi-storey scenario such as hospitals, colleges.
- Fixed Reader: Automatic log-in and exit on the entrance/exit or shelf, suitable for the control of the flow of valuable equipment, confidential equipment.
- Phone APP Inventory: Scanning QR codes with a standard phone camera costs the least, but requires Wi-Fi or 4G coverage and is slower than using a PDA in areas with many assets.
Point 4: Network conditions cannot be ignored
The hardware is selected, remember to confirm the network on site:
- There are WiFi or 4G:PDA and APP to upload data in real time, and sync when it is finished.
- No network: Select the PDF (which can save more than 100,000) to be stored offline, return to the office area and import in bulk.
- The metal is a serious workshop: the RFID reading distance will be reduced from 5 m to 1-2 m, and the number of antennas will increase accordingly.
Element 5: Software modules are tailored by scene
The functional pile is useless, and matching the scenes is key.Use of records and depreciationThe most important type of institutionConformity and inventory reportGroup needsMulti-organizational redeployments and consolidated statements. Depreciation (average age method, workload method, double-deduction method) is configured in the system and does not die in a program, so that the code is not changed when the financial rules are adjusted.
Point 6: Implementation in three steps is more stable than one-time go-live
We have the lowest rate of failure in phase:
- Phase 1: Get asset records, QR code/PDA stocktaking, and reconciliation between books and physical assets working end to end. Start by cleaning up the underlying data.
- Stage 2: Introduce RFID or inventory carts to handle bulk counts and counts by floor.
- Phase III: Interlocking financial systems, ERPs, auto-depreciation and data synchronization.
Each phase of 1-2 months, with 2-3 weeks for testing and feedback to users, is more economical than hard-to-paced.
Looking back, there is no standard answer to the program design for fixed asset management, but the path is clear: scene tagging, collecting hardware, network poaching, software modules, step-by-step. Any loop of this chain will jump through and be filled with a bill.