How do you design the fixed asset management system solution? The scene matches hardware.
RFID Knowledge

How do you design the fixed asset management system solution? The scene matches hardware.

PublishedShanghai Zejie Smart Technology Co., Ltd.

The design core of the fixed assets management system is to remove the use scene first and then match the label, capture equipment and software module. The scenario determines how the inventory is taken, which determines how the hardware is selected — both steps are wrong and all functions are to be reset.

Point 1: First, divide the asset management scene into three categories

The focus on fixed assets varies widely from industry to industry, and can be grouped in three broad categories:

Element 2: Label selection is the starting point for hardware matching

The label determines what equipment to read, and the common three categories have their respective applicable boundaries:

Element 3: Inventory decision to collect hardware

The scene and tag are set, then the count is clear:

Point 4: Network conditions cannot be ignored

The hardware is selected, remember to confirm the network on site:

Element 5: Software modules are tailored by scene

The functional pile is useless, and matching the scenes is key.Use of records and depreciationThe most important type of institutionConformity and inventory reportGroup needsMulti-organizational redeployments and consolidated statements. Depreciation (average age method, workload method, double-deduction method) is configured in the system and does not die in a program, so that the code is not changed when the financial rules are adjusted.

Point 6: Implementation in three steps is more stable than one-time go-live

We have the lowest rate of failure in phase:

  1. Phase 1: Get asset records, QR code/PDA stocktaking, and reconciliation between books and physical assets working end to end. Start by cleaning up the underlying data.
  2. Stage 2: Introduce RFID or inventory carts to handle bulk counts and counts by floor.
  3. Phase III: Interlocking financial systems, ERPs, auto-depreciation and data synchronization.

Each phase of 1-2 months, with 2-3 weeks for testing and feedback to users, is more economical than hard-to-paced.

Looking back, there is no standard answer to the program design for fixed asset management, but the path is clear: scene tagging, collecting hardware, network poaching, software modules, step-by-step. Any loop of this chain will jump through and be filled with a bill.