How does the asset management system software company assess its delivery capacity and service network?
Assessing the asset management system software company,Delivery capacityandService networkIt's two more easily verifiable dimensions of the contract terms. The first decides whether the project can be scheduled to fall, and the second decides if there's a problem on the line that can be solved. The function, price, branding, of course, is also discussed, but leaving both are in vain.
Point 1: First look at the delivery record and see if you can get a comparable project case.
It's not gonna help how many projects you've done.Close industry, close size, verifiableCase. Three steps:
- Asked about the total number of projects delivered by each other over three years and what was the proportion of them in asset/equipment category. Less than 60 per cent indicated that operations were not focused.
- Ask for two or three reference customers you can contact,Best in industry, same volume.. Direct reference client: what was the original planned cycle, actual delivery cycle, reasons for extension, number of changes.
- Look at the contract amount. Asset management projects are usually in the range of 300,000 to 5 million, much less than this area, with a much higher level of vigilance about functional castration, much more than it is to clear up software fees, implementation fees, customization fees or annual fees.
Element 2: Mapping the methodology for implementation. Standardized processes are more important than "experienced"
The implementation cycle of the asset management project is usually 3-9 months, with a multi-linking and business-related structure, and unmistakable teams are easily out of control.
- Research and blueprintsInventory of asset classes, billboard fields, depreciation rules, approval process, and output of the written Business Blueprint Document.
- System configuration and developmentBased on the configuration of standard products, customized development is as limited as possible to 20 per cent of total workload, which exceeds the description of poor product suitability.
- Data Migration: Historical asset cards, depreciation data, purchase vouchers imported, usually with a rate of error below 0.5 per cent.
- Training and piloting- Training in role (administrators, users, approving officers)Piloting in one sector and replicating it.- And avoid a one-strip switch.
- Go online and check and check.: Batch-to-switch, usually after the month end.
When serving the manufacturing clients, Shanghai-based SIT will break these five steps into 17 specific delivery nodes, each with written output that will allow customers to see progress at any time and expose project risks as soon as possible.
Point 3: Core team stability, high risk of ad hoc collaging of key positions
The project is going to be good, mainly for the project manager and the main consultant. But there's a disease in the industry:Senior consultant at pre-sale stage to talk about the programme, and then replace the new guy with the winning bidHow do I avoid it?
- It's in the contract.Name of project manager, principal consultant, length of service and similar project experienceIt's not working to write "the team of senior advisors."
- The agreement on the change of key personnel during a project requires written consent from the client and no less experience in replacing the candidate than that of the original person.
- Look at the size of the corporate team. If there are fewer than 30 people in the asset management system company, it is difficult to ensure speed of response when multiple projects are running in parallel.
Point 4: Service networks and after-sales, and local response capacity is not limited to sales
The asset management system is sold after the top of the list -- there are transactions like inventory, end-of-life, transfer, depreciation adjustment, and it's normal to report errors.
- Service Point Distribution: Does the company have implementation or support staff based in your city or a neighboring province? Asset-intensive operations such as factories and industrial parks typically require arrival within two hours or a remote response within four.
- Hotline and worksheet systems: Is there a 7x12 or 5x8 after-sale hotline, and does the worksheet respond time, and does the resolution rate have a written commitment.
- Intertemporal rhythm: How often on average a product is updated (a small version is normal every 2-3 months), whether the annual service fee contains a regulatory fit (e.g., depreciation policy adjustment) and whether it can be obtained from the product Roadmap.
- Knowledge transfer• Whether it is possible to provide training for managers, operational manuals and common list of issues so that your own IT or administrative staff can handle 80 per cent of day-to-day problems.
For example, in areas where manufacturing is concentrated in East and South China, local presence services are more demanding. If suppliers can only support them remotely, it would be advisable to have travel costs, time limits for arrival and exoneration clauses in the contract well in advance.
Point 5: The contract SLA clause should not be limited to the total price
Beyond prices, SLA (service level agreements) is a provision that can truly bind suppliers and focuses on four indicators:
| Indicators | Recommended criteria |
|---|---|
| System availability | 99.5% (44 hours per year) |
| Fault response. | 1 hour of critical failure, 4 hours of general problem |
| Problem resolution rate | 95% of the monthly lunar cylindrium |
| Notification period for promotion | 30 days ' notice and rollback programme provided |
The obligation to breach is also to be clearly stated: failure to meet the standard is reduced by a certain percentage of the service fee, or the length of service is extended.
Summary
Assessing the asset management system company,Delivery capacityIt is a historical case, an implementation methodology, and team stability.Service networkCheck local coverage, response time, and how often the supplier delivers updates after purchase. Put these commitments in the contract rather than relying on verbal assurances from sales staff. Evaluate at least three suppliers against the same checklist and compare their scores before deciding.