What are the elements of asset management?
RFID Knowledge

What are the elements of asset management?

PublishedShanghai Zejie Smart Technology Co., Ltd.

During an annual stocktake at a precision components plant, two dusty machines were sitting in a warehouse corner with their nameplates mostly covered in oil. Purchasing said it had not bought them. Production said it had not used them. Finance spent hours going through vouchers before finding that one had been bought three years earlier as backup for a project and the other had been moved from another line after it was retired. With a combined original cost of nearly CNY 200,000, they had sat idle in the warehouse for three years.

This is a general problem: many businesses have asset management, which is actually only "recording" in the first part of their life cycle. They have six main stages -- planning to set up items, procurement acquisition, bookkeeping, running maintenance, change of assignment, decommissioning, each stage requires a desk account, record-keeping and approval process, less one link, and then a few times more to fill it out.

Planning and procurement phase: keep the books in front of the accounts, and make less devious moves

The first stage of asset management is to plan the project. This step is not "want to buy," but "should not buy." What needs to be done is to submit a request for procurement based on business requirements, with clear instructions about equipment use, technical parameters, budget amounts, expected life years, and to submit it to the joint procurement and finance review. Once a project is approved, it will have to enter the selection of the budget and procurement modalities, open tendering, invitations to bid, single-source procurements with an applicable scenario that cannot be generalized.

The core output of the procurement acquisition phase is a contract, invoice, receipt and inspection form. The contract must indicate the configuration list and time of delivery, and the receipt and inspection form must be confirmed by the user office's signature. Here is a specific case that can easily be ignored -- random records of equipment, instructions, warranty certificates, which are filed with the equipment, not left in the personal hands of the purchaser. We have seen a factory in the project because the original file was missing, and five years later compliance audits were forced to stop and correct, and losses far exceeded the savings on paper.

Recording and filing: get "id" on every device.

The asset card is the "ID" of this device, and the information to be registered includes the asset number, name, specification type, manufacturer, exit date, original value, use department, location, responsible person. Asset numbers are best prepared according to rules, such as "Sector Code-large code-flow" which allows for classification and subsequent scanned count. Once the number is determined, do not change easily, otherwise historical account and depreciation data will be confused.

When creating the record, apply a physical tag with the asset number and essential identifying information. Accurate counts depend on matching each item to its record. Many companies show 100 machines in their financial records but have only 93 in reality. Such discrepancies are the most common asset management pitfall. At best, inventory reports fail to reconcile year after year; at worst, an audit finds that asset controls have broken down.

Operation and maintenance: how do you manage it every day?

The most important thing to do at this stage is to use records, maintain plans, repair records, inspect records, and change the status. Use records vary by type of equipment: Key equipment must record the start-up time, operating parameters, operators; Normal equipment can only account for the date of commissioning and the person responsible. Maintenance plans are prepared on the basis of the plant's recommendation and actual performance, such as a three month exchange of oil for hydraulic equipment, and an insulation check by the normal electric power unit every year.

Maintenance records must be kept in full, including failure phenomena, maintenance content, replacement parts, maintenance costs, maintenance dates and maintenance personnel, which accumulate to a certain amount, and can in turn guide procurement decisions -- for example, the power of a model has been repaired five times over three years, and the next purchase is considered for remodeling. Regular count counts cannot be omitted, and it is recommended that a sample count be made quarterly, with a full inventory taken every year. The count is not just a number, but rather a check-up, an anomaly -- if there are assets lost, whether there are private transfers or no unused ones -- these problems will only be revealed at the time of inventory.

Shanghai-based Cheeky Way Technologies, in its asset inventory coaching for clients, checks with bar code or RFID device scans, compressing the count time from two weeks to two or three days, and keeping the error rate at a very low level. The essence of this approach is to turn past work on artificial memory and paper table books into standard actions that can be done by using a sweep code.

Change and redeployment: assets are easily problematic when they move

The transfer process is very rarely the same place. The transfer order is made by a process, and it cannot be verbally moved. The transfer process is defined as an application, approval, physical handover, and the account update of four steps. The transfer order must include a clear asset number, the original user department, the new user department, the date of transfer, signature between the parties, the synchronised update of the desk account, the depreciation of the account, and the responsibility for maintenance should be followed by a clear change.

The same thing is to record changes in asset status. From "difficult" to "inactivity," from "inactive" to "sequeal", from "contain" to "end of life," every change in condition is subject to approval, and the state cannot be changed. There were employees who thought that the device was "no one used," and they broke down parts privately for scrap, and it took six months to find out -- at the root, the change process was not running.

Decommissioned and disposed of: the last step is often the most easily used to step on a pit

The end-of-life process is usually a request from the user department, specifying the cause of the end-of-life and state of the equipment; technical department validation, confirming whether it is not possible to continue using or repair; financial services accounting for residual value and depreciation already raised; and final management approval.

The first is environmental compliance, such as oil-containing equipment, equipment for toxic and hazardous substances, which is disposed of through a highly qualified recycling channel, which cannot be sold to waste stations at will, or the enterprise is subject to environmental penalties. Second, accounting compliance, where the carrying value of the assets that are scrapped is written off from fixed assets, otherwise the stocking of the equipment that is no longer in place is going to increase the amount of data, and eventually the difference between the Zinventory counting accounts becomes even greater.

Linking the whole process: key elements of asset management

After six phases, it is clear that asset management is not a single undertaking but a consistent system. There are four key elements to aligning the system.

The first is...Process institutionalizationEach stage of the operational steps, responsible department, document template is written into a system document and cannot be agreed orally.Data centralizationAll asset data — from planning requests to write-off — are stored centrally in a system to avoid being dispersed over spreadsheets, paper documents and departmental computers.ConcordanceFinancial, equipment and physical items must be reconciled on a regular basis and differences identified and processed in a timely manner.Responsibility rests with the people.Each asset must have a clear responsibility, and the system would not be a dead letter if it went back to human beings.

Asset management looks like "a piped device" and it's essentially a housekeeping business -- clear of the controls, in order to get a procurement decision, tax audit, compliance check, production movement. From planning to decommissioning, data and processes are connected to each other, and this system is really going down. If you remember one thing, that is, asset management is not a single account, but a whole chain that runs through the asset from entry to departure, which is missing, and then it takes several times to fill it.