What are the cases of fixed asset management systems landing in manufacturing?
Many people think that fixed asset management is a matter for Treasury, and it can be handled by Excel accounts and annual inventories. The reality of manufacturing is: equipment is constantly flowing between workshops, the molds are called in line with product changes, and a static form alone does not match the physical material on the ground. The key to managing this is to give each device an "id" and to consolidate the change of location and disposal process into the system.
Manufacturing assets, why Excel and ERP can't handle them.
A common misconception is that fixed assets are already on the ERP, and the original, depreciated, residual values are clear. The problem is a crack between "clear" and "physical" clarity.
The ERP asset cards are mainly for financial accounting, and record the financial fields of depreciation, net value.
The manufacturing industry is characterized by "move": a processing centre may still be in Workshop A last week, but it's been transferred to Workshop B this week to support new projects; a pressure mold may have been used 300 times this month, and the next month's change will be idle for six months. Financial cards will not follow the device, but the physicals are moving on the ground.
In this state, the annual inventory is turned into a "field search + memory form" where differences in accounts are often significant and where financial services can only digest them by way of an adjustment, but where the equipment goes remains unclear.
Three bottom-up actions for manufacturing fixed assets.
To untangle this problem, the management of assets in manufacturing is actually three things: "identity card" for an asset, recording its change of location, and solidifying its disposal. The first two are technical, and the third is management.
Giving equipment an ID means putting a barcode or RFID tag on each machine and mold. Uniqueness is key: five identical CNC machines need distinct IDs, not ambiguous names such as “Machine Tool 01.” A barcode label only costs a few tenths of a yuan. The hard part is tagging every existing asset and placing printed tags consistently for easy scanning.
The change in location is based on a mobile application. By scanning the bar code with a PDA or a cell phone, you can do the transfer, move the library, take back the operation, the system automatically records time, people, new position. You really can survive the experience by having an employee fill Excel after it's time.
The solidisation process is the process of disabling, transferring, and eliminating these actions into a workflow with an approved node. A system that idles a device for more than a few days automatically reminds the responsible person, either to transfer it or to end it, to go through the approval process. This step is actually the hardest part of fixed-asset systems because it changes management habits directly.
It's in the workshop. Three scenes run like this.
Multi-workshop equipment redeployment
A machining factory had three workshops and nearly 200 machine tools and inspection instruments. After projects ended, equipment would be left in corners across the workshops. No one knew which team owned which device, so people had to search when they needed one.
After the online asset management system, each device is labelled with a bar code and the workshop assignment must be scanned: Starts to transfer to another workshop to receive the upgrade of the tiding system. One year later, the equipment has largely disappeared, and the transfer history can be traced. This scenario is based on the mobile end experience and offline scanning capability -- the network instability in the workshop is normal, and the sweep operation cannot be blocked by a grid break.
The entire life cycle of the mold and the costume
The role of the stylist and stubbles is to be found in the capital.
A typical approach is to link mold usage records to production work orders. Scan the mold each time it is mounted on a machine. When it reaches its design life, the system automatically prompts staff to service or retire it. This avoids batch defects from overused molds and the waste of retiring them prematurely. For this level of automation, the asset system needs to integrate with the MES or production management system. For small and midsize manufacturers, digitizing mold checkout, returns, and maintenance already addresses 80% of the pain points.
The count went from two weeks to two or three days.
The most painful thing about manufacturing finance every year. A factory of about 5,000 assets, traditionally led by the Treasury Department, is a team that pulls people together, handwritten the printed inventory on site and then goes back to the office and enters it in Excel reconciliations, which often takes two to three weeks.
After using a mobile inventory, the inventory person takes the starting terminal or cell phone to clean the asset bar code on site, and the tag is "in-the-book", the unscruised automatic entry list, the system compares in real time with the desk account, and the end of the count report shows. In practice, the plant count cycle of similar sizes can generally be reduced to about one third of the original level, depending on the degree of fragmentation of the assets. The time varies. The barcode label coverage is high enough -- if half the asset is not coded, the full-calculable difference cannot be swept, it is more difficult.
Three steps, more important than the software.
Many manufacturing firms want to go to the asset system, and the first response is which software is selected. In fact, software selection ranks in third, first cleans the table, and second, code.
The first step is to reconcile the accounts. The existing Excel account is being physically cross-referenced, the coded system found and the "to write off" process disposal not available. This step is most significant but cannot be bypassed.
The second step is to cover all the details. Newly purchased assets are marked when they enter the bank, and old assets are subsidized in instalments.
The third step is the core module of the online system: mobile sweeps, transfer processes, inventory modules, end-of-life clearance.Shanghai Picking Up Tech Ltd.It is usually recommended that clients start with a workshop pilot, which is the most visible in pain, run through processes and spread horizontally instead of one-off plant-wide rollovers — this has the least impact on management practices and has a higher success rate.
The key to the selection is not a lot of functionality, but whether it's going to be on the scene.
Returning to the question of whether fixed asset management systems were located in manufacturing, not at their cores, but at the level of sophistication of the system itself, and whether or not three on-site problems — where the equipment was, who was using it, should be disposed of — could be resolved.
It's enough to judge whether a system is suitable for manufacturing: if the mobile end works independently from the computer, if the inventory can support multiple people and sweep at the same time, if the disposal process can customize approval nodes. Without meeting these three points, more than one feature will be put in Excel.
It is recommended that the manufacturing enterprise preparing for the system should first clear up its existing billing and physical on-site over a period of one or two months before it can be tested with specific scenes, which would be much more useful than looking directly at the product presentation.