What are the functions of the plant fixed assets management system? Workshop and storage scenes fit
RFID Knowledge

What are the functions of the plant fixed assets management system? Workshop and storage scenes fit

PublishedShanghai Zejie Smart Technology Co., Ltd.

Asset-building and code: first, a "ID" for each asset

Many factories are at the beginning of the system, and the most easily pedal is a miscoded asset. The same equipment is on the purchase order number 001, and then the workshop account becomes "Depreciation 3" -- another number for the financial depreciation statement, which is not normal.

The more stable approach in the exercise is to harmonize coding rules by "class code + year + serial number", for example, the mechanical processing equipment category code M, which was marked M-2024-0003 when it entered the plant in 2024. The codes are locked to death once they have been determined and no intermediate modifications are allowed.

The minimum on the asset card is to record the date of purchase, original value, supplier, user department, location, current status (in use/inactivity/maintenance/to be scraped). When we deploy the system to a manufacturing firm, it is usually recommended that the client first combe the asset desk by this calibre, and all subsequent modules rely on this card.

Workshop scene: mind your location, state, responsible

The assets in the workshop are scattered between the workspaces, production lines and teams, and are not enough for "in use" or "in idle". The following sections need to be supported:

Dynamic changes in location and responsible persons

The equipment often moves between different processes – for example, a test instrument is borrowed for one week from the assembly line to the ageing room.

The system needs to support the transfer order process: the initiating authority fills in the original use of the transfer order and identifies the receiving department for automatic updates of asset location and current liability.

Status breakdown and maintenance records

The equipment status proposal is broken down at least to: normal operation, standby, maintenance, pending repair, storage, and end-of-life.

The maintenance records are not simply a record of an expense, but rather a record of the failure, the way in which it is done, the replacement of spare parts, the time of repair work, the time of stop. These data accumulate for one year, and you can see what equipment has a high rate of failure and which spare parts are consumed.

Special management of the work kit

The low-value, large-volume unit of such assets as work packs is the most easily "unreconciled" part.

Warehousing scene: Tied space and assets

Asset management in the storage scene is centred on matching space with assets.

Warehouse area and cargo position structure

The warehouse of a plant is often divided into raw material areas, semi-finished goods zones, finished products areas, swing space areas, spare parts areas, and sub-sectors to distribute shelves and cargo positions. The system needs to support the warehouse-area-position level III structure, where each asset or batch of spare parts can be attached to a specific cargo position.

Access to the garage and redeployment process

The inventory is also scanned, the asset status and service are updated. The entire process leaves a complete file stream that facilitates subsequent tracking.

The system needs to support the transfer process: When a workshop requires some equipment, it is moved out of the idle warehouse and the transfer order is automatically generated. The system warns when continuous idleness exceeds the set threshold (e.g. 90 days) and recommends disposal.

Inventory: from the end of the year, to the day-to-day dynamic disk

The traditional count is a one-time sweep before the end of the year, often with insufficient staff and a pass. To get the accounts to work together, two mechanisms are needed:

One is a periodic inventory, which is proportional to the monthly or quarterly drawings by asset class. For example, 20% of the equipment is charged per month, covering all of them half-yearly.

The second is a dynamic inventory of assets with frequent changes in location (e.g., assembly, utensils), which is counted as a "micro-count" at each time and the sweep code detects an abnormal position that immediately alerts the police.

The PDA or mobile phone-end sweeps are the basic configuration, the inventory table is automatically generated, and the difference items are uploaded in real time. We usually tie the two-dimensional code of the PDA count process and asset card to the project, so that staff can see the asset information and current location by cleaning the terminal with their hands.

Depreciation, end-of-life and financial linkage

Fixed asset management does not bypass finance, but many factories suffer from the separation of equipment and financial data sets.

The system needs to support the automatic calculation of depreciation - average of years, workload method, double-deduction method and automatic generation of depreciation at the end of each month to the financial system, as per preset rules.

The process is also documented: the use of a technical validation process initiated by the department to validate the physical disposal of financial write-offs.

Data board and decision support

Finally, you have to look at what management needs to see - a data board.

These indicators are automatically updated daily, and the management can see them when they are turned on. When delivering the board, Shanghai-based Sieve Technology customises the calibration of the indicator to match the actual management claims of clients, avoiding a stack of indicators but not one that can be used for decision-making.

Some lessons learned

These five recommendations are more positive, looking back at some of the projects that have been undertaken:

  1. The code rules and asset cards need to be clear before the system goes online, so that no old books are on line.
  2. Workshop and warehousing are two distinct scenarios, with functional modules designed separately and not rigidly combined.
  3. The breakdown of the status is more important than the number of functions, and five are clearly more effective than a dozen fancy functions.
  4. The key to the inventory is not a tool, but a frequency and discrepancy-processing mechanism.
  5. Financial linkages are considered at the early stages of system design, and not wait for financial services to raise demand.

In this way, the plant fixed asset management system can be put in place and not remain "accountable"-based.