How do we choose a national asset management system?
The selection of a national asset management system, with two lines at its core: one is whether the CBI can actually land — not just fit it, but run with performance, data migration and ecological interconnection; the other is whether localization services cover your area and are able to respond in situ. Both lines are satisfied, and look back at the functional details.
Where are the main gaps in the comparison of national production asset management systems with foreign systems?
The national production asset management software has been fast-tracking for almost three years, and the mainstream products have already met the day-to-day needs of most enterprises in core modules of fixed asset life cycle management (from procurement, warehousing, depreciation to disposal), inventory and reporting.
There are two main gaps: the flexible configuration of complex scenarios, such as cross-legal subjects, cross-currency, asset accounting logic under multi-organizational structures; and the stability in high- and multi-organizational settings, such as when large group headquarters simultaneously make assets for thousands of branches ZZQQZ, the speed of response from some national production systems is still not equal to older foreign products.
In turn, the national production system has three advantages that are not easily replaced: compliance with natural domestic regulatory requirements (creatives, etc., data not to leave, etc.); localized service teams can basically respond on or after the day; custom development cycles are short and change costs are low.
What's a match? Why should it be first in the selection?
Adaptation to China's domestic IT ecosystem means making software run on Chinese-made infrastructure in four categories: CPUs, operating systems, databases, and middleware. The State Council's August 2020 Policies to Promote High-Quality Development of the Integrated Circuit and Software Industries in the New Era called for innovation in IT applications. Party and government bodies, central state-owned enterprises, and financial institutions then began replacing systems with domestic alternatives. This moved into a comprehensive replacement phase after 2023 (source: State Council policy documents and public industry reporting).
The choice of a model that puts CRS first because once the business system needs to migrate to an ICT environment, it's three problems: performance is down, and the original seconds of reporting may take ten seconds; migration of the original data is incomplete, which requires a back-up or manual reconciliation; and the interlinking of upstream and downstream systems (e.g. financial ERP, MES) will break off.
The question is whether a product is really a match for a letter, not just that it has several names on the brochure, but three specific questions: whether there are open third-party letters certifying; if there are cases of mail falling with business clients; and whether you would be willing to offer a POC test of the creative environment, so you can run over your real data.
What does localization mean? How do you judge if the manufacturer can do it?
Localized services are not as simple as "I have an agent in the field" and they consist of at least three layers: first, a 7x24-hour telephone or online support that can solve most of the day-to-day problems remotely; second, there is a local team of own engineers (not outsourced) who can come in on the same day with problems; third, there is a fielded support, where people are stationed on the site for large projects or key nodes.
The localization of the service provider is judged by four indicators: a list of city coverage at the service point, which requires written provision from the other party; a time limit for responding to commitments (telephone response, home-to-door response, how long each problem will be solved); size of the service team and percentage of clients served, where an excessive number of customers per person means that the response will be less; spare parts storage and emergency mechanisms, whether hardware-related failures can be quickly replaced.
Shanghai-based Chettech has a permanent implementation team in the Long Triangle and South China, and our standard approach in this project is to write down response time limits as specific numbers (instead of "timely responses" vaguely) and review service data on a quarterly basis. This practice helps us and many clients reduce their maturities by more than half.
The most easily stomped pits in the selection.
Pipe I: A list of functions that are overcomparison.The longer the list of functions, the easier to be attracted, the more a dozen key modules in the asset management system are, the more or less covered in mainstream products, and what really opens the gap is the depth and flexibility of these modules. The hundreds of systems that function but each do very shallowly are not as well-functioning as they do.
Pipe II: Ignore the costs of data migration.The migration of data from Excel, old systems, paper billings often accounts for more than 30% of the project. For example, a medium-sized customer who is a warehouse logistics provider, asset records are scattered in three old ERP systems and two sets of Excel Culrice, which take two months before and after the migration, longer than the system itself does. Before selecting the model, you take a clear inventory of your own data (how many asset records, how many historical documents, if any photo attachments) and ask for a manufacturer to make an evaluation of the relocation programme and time.
Pit Three: Consider the letter-making certificate "the ticket" instead of "the exam."The certification only indicates that it is suitable to run steadily.
♪ Jumping POC directly to contract.No asset management software is cheap, and it takes at least one to two weeks before signing a POC to run with its own real data, real business processes, focusing on three high-frequency scenarios: inventory count, depreciation, statement.
What indicators are the focus of the acceptance phase?
The acceptance cannot be based solely on "serviceable" functions, but on a number. Performance indicators are measured at three: single page opening times of no more than 3 seconds; no Cardon for the inventory operation of 100 or more assets; and mass export of 10,000 data not exceeding 10 seconds (reference value, specified as product technology document).
The data integrity is subject to a line-by-line reconciliation: the total number of assets, total value and classification distribution prior to and after the move is consistent; depreciation results do not exceed 0.01 per cent compared with the old system; photographs, annexes to contracts are normally opened.
The actual data of the CPU environment is also included in the acceptance report: CPU occupancy rate, memory occupancy, database query response times, which are often not synchronized with X86 platforms on the CPU platform and are left in separate files to inform subsequent capacity planning.
Finally: How can selective decision-making be translated into enforceable action?
Dismantling the selection in three steps would be more efficient. The first step would take two to three weeks to combo internal needs, and list the core scenes of asset management (usually 8 to 12) in order of priority; the second step would take this list to screen the manufacturer, which is contained in 3 to 5 homes, each requesting authentication with Industry Case Studies and the letter; and the third step would take two weeks to do POC, which will eventually select 1 to 2 for business negotiations.
In addition to prices, the negotiations focused on three matters: the specific number of service level agreements (SLA) and the maximum working hours for data migration; attribution of source code or core data (especially portability of data in future replacements); and the mechanism for subsequent upgrades and the pricing of module extensions.
The maturity of the national asset management system is over "Can it be used" and now it's about "Stable Use, Problem or No Man." Look at the two lines of "Creativity and Localization", which are left-over functions, prices, secondary development capabilities, can be weighed in a more manageable context.