Use of RFID automatic recognition technology to achieve LED light intelligence control
Industry News

Use of RFID automatic recognition technology to achieve LED light intelligence control

PublishedShanghai Zejie Smart Technology Co., Ltd.

A remote switch or fluorescent requires a control, power and communication system.

Roadlight identification and long-range lighting are not the same.

The identity of the equipment should also be reliable against the control address.

Read the sticker. The lamp is not certified to be working.

RFID helps maintainers to identify the street lights and files, while remote luminaries require appropriate control and communication links. Disaggregating them is a way of assigning responsibility for the equipment. Maintenance completion cannot replace actual light operation checks, and confirmation should be specified.

Public facility identification capacity needs to be linked to disposal capacity

The e-identity of a public facility helps to identify the target and maintain the record, but the discovery of a dangerous state usually requires a sense, inspection or other evidence.

Online rates are not a substitute indicator of the effectiveness of public services

An online device indicates the existence of a communication, but does not prove that the target is safe, mission accomplished or service available. Public facilities projects should measure identification, status detection, responsibility and disposal review separately, and identify what evidence supports each. If an alarm persists but no one handles it, increasing the collection may only increase the number of to-dos.

An easily ignored reversal.

The lamp is changed after maintenance, the body of the rod may not be the same, but the lamp should be updated; the controller may also be replaced independently. If all information is placed under a pole, it is difficult to explain the part's resume for long periods. The level should be determined by the maintenance target, rather than adding only one label to the facility.

Put your judgment in the real situation.

The replacement of the performance lamps, the switch of controllers and the damage to markings were performed to verify that the worksheets, files and actual control objects were in line.

It is recommended that the alarms be checked for arrival on duty in accordance with the design exercise of the facility's failure to connect, mark damage, fault detection and maintenance review.

Don't just look at the successful samples.

Observation dimensions Evidence to be retained
Facility identity Interval of markings with geographical or archival locations
Shut the ring. Discovery, billing, disposal, review traceable
Continuity of service There is an alternative process for the break-off and equipment damage
This is the key trade-off. Will digitization simply make street lights easier to name, or will it make failure more quickly discovered and repaired?

It's worth asking.

Will digitization simply make street lights easier to name, or will it make failure more quickly discovered and repaired?

Technical and factual references