Implementing RFID Fixed-Asset Management with Tag Binding and an Asset Register
Industry News

Implementing RFID Fixed-Asset Management with Tag Binding and an Asset Register

PublishedShanghai Zejie Smart Technology Co., Ltd.

Many people think that the RFID label is a fixed asset management exercise, and the practical difficulty is whether the labels, objects, and billboards can be matched.

RFID fixed asset management. The core is not labeled.

The RFID is a recognition technique for reading label information by wireless means. The label itself usually carries only one unique number, asset name, specification, responsible person, location, purchase date and so on. The advantage of doing so is that when assets are transferred, maintenance or change of duty does not have to change the label, but only updates the desk records.

An enforceable set of management relationships can be simplified to:

Object Main elements Management requirements
RFID Tag Label unique identifier, asset code Keep the only one, not to repeat it.
Fixed assets Physical name, model, serial number, photographs Check with physical items per case
Managing desk accounts Location, duty-bearer, status, change of record Every time you're in a flow, you leave a record of your operations.

Before you land, set the asset code and the billboard field.

If there is no harmonization of coding rules, then issues such as “a multiple number for one asset” and “the same number corresponding to a multi-unit asset” can follow the structure of “organization area + asset class + flow code”, e.g. separate numbers for office equipment, production equipment, detection equipment. The code should not be too long and field personnel could check it; the two-dimensional or text codes on the label should be consistent with the system's asset code.

The account fields proposed to be divided into four groups:

Asset photographs are not mandatory, but they help with the similarity of equipment and the larger scenes. It is recommended that at least one photograph be kept that can see the whole look; for the host, the instrument or the device with the serial number, a stamped photograph can be added. The photo is used to check the physical, and should not replace the asset code and text field.

Label binding is "one size at a record"

Label binding is key to the process. After the operator has taken an unused label, read the only identifying number of the label, then create or select a new asset in the system, enter an asset code and physical information, save the tie, and then again read the tag on site for validation. Once the tag identification number is completed, the asset code and the physical must match.

  1. Clear basic data:Merge the original Excel, Treasury account or departmental list to remove duplicate records and mark assets lacking physical information.
  2. Physical verification on site:The name, model, serial number, location and responsible person of the asset by region are not directly tied to the old desk account.
  3. Generating asset code:Encoding new assets, retaining original and retroactive numbers for historical assets or recording old numbers in notes.
  4. Writing binding relationships:Linking the label identifier to asset code and recording in the system the time of binding and binding.
  5. Review completed:Read the label again to check whether the name, location and responsibility of the assets returned by the system are consistent with the site.

If the same asset has a mainframe, monitor, extension module, and many independently managed components, such as an asset, it should be determined in advance whether to manage the asset by one asset or to split into main items and attachments. Once the rules are established, subsequent counts and end-of-life are performed with the same calibre, avoiding any displacement of the host, and the annex is still attached to its original location.

The label selection and the location of the installation will have a direct impact on the recognition.

The fixed asset label is not as good as the distance to read, but it's key to match the material of the asset with the environment and the inventory. A normal paper or plastic surface asset can be used for a conventional non-dry glue label; metal cabinets, metal equipment or assets with larger metal surfaces should choose the label that applies to the metal surface. High temperature, outdoor oil pollution or frequent polishing areas are required to verify the heat resistance of the label, water resistance and the level of robustness of the sticker.

The label should be installed in a manner that avoids the inscription, heat vents, active parts and collision-prone locations. For similar devices, the label position is as uniform as possible, for example, on the top right corner of the device or on the side of the cabinet, and the counter can be identified more quickly. The visual number on the label should remain clear, not subject to cable, protection shell or other identification.

Determine read range, volume, and missed reads through on-site testing instead of relying on published equipment specifications. Before rollout, select at least three representative asset types, with about 10 items per type. Test single-item reads while stationary, reads of assets carried by multiple people in motion, and batch counts. Record read distance, tag orientation, time per read, and missed reads, then adjust tag placement, equipment power, and counting routes accordingly.

The desk account management is run around the asset life cycle.

The RFID inventory addresses "Is there any asset on the scene, or is it read out?" And the bill also says, "Who's in use, where, what status, what changes have occurred." So, account, receive, assign, borrow, repair, return and end-of-life should be matched, rather than simply modify the location at the count.

Business scene System Actions Information to keep
Access Change in asset status to active Recipient, department, time, location
Redeployment Change of attribution and location Out-of-post, in-place, approval records
Maintenance Status changed to maintenance Time of service, failure statement, return time
Checkpoint Compare system records with live reading results Discarded, undischarted, not in line, label abnormal
End of life Locking asset status. No further access. Reason for end-of-life, approval time, disposal records

The authority is also divided by position. Ordinary users can view their own assets or those of their department, and the asset manager is responsible for binding, transferring and inventory counting confirming, and the system administrator is responsible for base configuration. Deassembly assets, changes to history records, etc. should keep operators and time, so that there is no more than one explanation.

The inventory process must be able to handle anomalies, not just count numbers.

A practical inventory process usually includes job creation, area confirmation, live reading, abnormal review and result confirmation. The system reads labels, and automatically marks them as " disked " ; unreadable assets enter the " undisclosed " list, and then check for changes in location, delabelling, device shutdown or on-site environmental impact.

The results of the inventory should be distinguished at least between the following categories:

The “unread” is not directly considered to be lost, nor is it directly considered as being consistent with the accounts.

Fits to start online from one area and one type of asset

A one-time coverage of all sectors, easy to mix historical data issues, equipment configuration problems and management process problems. It is more prudent to choose a centralized asset, a clear operational boundary area for piloting, such as office areas, storage areas or between devices, to first complete an inventory of assets, code, labels, inventory and transfer tests.

The four indicators that you can focus on during the test run are: number of label-bound errors, number of missing readings in the field, number of missing places, time-consuming individual inventory. These indicators are used to adjust process and equipment parameters, and it is not appropriate to preset fixed results without testing. After the test is stabilized, then expand by sector or region, and write the anomaly treatment rule into the instructions.

When designing such a management process, Shanghai-based Shang Jieji Tech usually uses the technology configuration to be processed after physical inventory and desk booking rules: first, it is clear how assets are classified, who is responsible for identifying changes that must be marked, then it is determined that labels are material, read equipment and system privileges. So RFID does not become a simple "poster project" but rather part of the day-to-day asset management.

Conclusion: Uniform rules before propulsion equipment and systems

The location of the RFID fixed asset management is three: a label identifier is precisely tied to the asset code, a billing field reflects the real state, and assets change and inventory anomalies are handled in a clear way. Implementation follows the order of "check-in-assets-coding-select-label-place-tape-to-screen-modify" rule. As long as each asset is identified with precision, search and trace, RFID can really perform its administrative value.