How do you customize the rfid electronic label?
Industry News

How do you customize the rfid electronic label?

PublishedShanghai Zejie Smart Technology Co., Ltd.
Custom electronic tag development is a project that generally goes through six stages: requirements assessment, initial product selection, cost assessment, prototype development, field testing, and refinement of the selection. Depending on the complexity of the requirements, a project can take as little as half a month or more than three months.
1 Needs assessment
Needs assessment is the most critical step, and we need to assess whether RFID technology is needed based on user applications. Not all applications are suitable for RFID technologies, such as many primary agricultural and industrial products with trace sources - cabbage, grapefruit, steel, piped tubes, etc. - which are not of high value in themselves, cannot be affordable, and can be applied because of interference with the application. So, more often, less costly barcode techniques are used to solve problems.
When should you choose RFID? Consider airport baggage sorting. First, on cost: aviation operates at scale, provides high-value services, demands speed, and can bear higher costs to improve efficiency. Second, on technology: baggage barcodes are not always in the same position, making them difficult to read and process in bulk. Reading bags one at a time often takes manual intervention, which is slow and expensive. That creates strong demand for RFID: UHF can greatly speed sorting at relatively low cost without sacrificing accuracy. In short, requirements assessment means checking whether RFID meets both the technical and cost requirements for the user's application, and adopting it if it does.
2 Initial Selection
The next step is to select the label type, after it has been clearly identified that RFID technology can address the “agonizing point” of demand. Based on needs assessment, selected label bands, product sizes, chip types, sealing form and installation methods are selected.
We use a breakable label as an example of the process: A client needs a label for overpack boxes for high-end consumer products, designed to prevent forgery and trace. To facilitate consumer validation, we recommend HF protocols; box sizes, with some flexibility in folding positions, we suggest to use a very soft, tornative, and very flexible, copper-based paper seal. For ease of installation, we use back-tape-painted.
When the chip is selected, the client proposes to use a chip they supply, and for that reason we redeveloped a line based on the chip information; given the need for a slightly longer label at the fold, which is over the size of the General Assembly, we recommend a rectangular label to the customer.
3 Cost assessment
After the initial selection meets the customer's requirements, based on its results, a cost assessment is made. The factors that affect costs are the type of chip, the form of containment, product size and data requirements, first, the chip, depending on demand, which can be used to select imported or domestically produced chips, generally, the higher the price of imported chips, the higher the price of stored chips, the higher the price of the more functional chips, such as encryption, TD functions, double frequency functions, etc. The second is sealing, the more complex the structure of the envelope, the harder the more difficult it is to contain, the higher the cost. Size is also an influence, usually the larger the size, the higher the price, but in the microlabelling area, the more difficult it is to process, the more the size is the lower the price. Data requirements are mainly about surface-cutting, data writing, data extraction and data correlation, each of which increases costs.
4 Sample development
The most important thing about the development of samples is not how much they cost, but how long they are going to be. The shorter this takes, the more space the project has to adapt to later stages, the higher the success rate of the project. Samples need a few steps, including antenna design, material production, antenna carving, manual work, physical validation, etc.
An antenna design 5-10 working days, and production and validation 10 working days. It is important to stress here that if conventional containment forms and process techniques are identified, the main development time is in the design of the antenna; if a new sealing form requires different process techniques to be tried, there will be more uncertainty in the development process, which does not guarantee one-time success, and it will take longer. The speed with which samples are developed is a test for one family.RFIDKey indicators of the customization capacity of electronic labeling enterprises.
5. Field Testing
Once the sample is developed, if you have to model the application scene for testing and then test the reliability. When the client receives the sample, the site is measured, the effects are evaluated, recommendations are made for optimization, including performance compliance, size adjustments, printing and data changes.
6 Selection Optimization
If the first sample fails to meet project needs, it will need to analyse data from client testing responses, even have to go to field research, aggregate information, identify optimization programmes, and do a second sample and test. So, a full sample development cycle takes about a month.