How did the spare parts management system software land? Data preparation and implementation
RFID Knowledge

How did the spare parts management system software land? Data preparation and implementation

PublishedShanghai Zejie Smart Technology Co., Ltd.

Many believe that the key to getting the spare parts management system online is to get old forms in. The actual landings are more dependent on data for physical and operational applications, clear rules of engagement and new processes for field personnel.

The starting point for a system landing is the definition of the object to be managed

The spare parts data is not just a name and stock, but three questions: This is what it is, where it is, and by what rules. It is recommended to specify the spare parts code, name, specification model, unit of measure, equipment or category, storage position, and storage status. Fields need not start with too many, but the codes and units should be harmonized, otherwise the same material may duplicate and inventory cannot be accurately aggregated.

The code can be based on a rule of stability and non-repetition within the enterprise, and it is not appropriate to insert all information that is easily changed into the code. For example, when the name of the material or the storage area is adjusted, the code should remain unchanged; the specification model is maintained separately. For parts of different units with different specifications for the same name, the same type should be checked by physical on-site, drawings or procurement information, which cannot be judged solely by the text in the old table.

Data is ready to start with a count and a cleanup.

Before import, the list can be prepared in the order of “collating lists - on-site checking - processing differences - identifying those responsible”. The list should contain at least material code, name, specification type, unit, storage space and book number; for critical spare parts, it should also supplement information such as equipment that is applicable, minimum stock or procurement cycle. Inventory levels need to be reconciled with actual inventory results and date counts recorded, avoiding using expired entries as current stocks.

Focus on the repetition of coding, inconsistent names, empty fields, unit mixing and failure material. For example, the same bearings are written in the table as "axis" and "roll bearings", which should be combined after verification of specifications; “one” and “sets” cannot be deduced by name alone. The record that cannot be confirmed is marked to be completed for speed, not to be filled out directly for progress. In such implementation issues, Shanghai Cheekytech Ltd will consider data validation together with field process confirmation, avoiding a disconnect between standard name in the system and the actual name of the warehouse.

The rules of operation determine whether the system is integrated into day-to-day work

The system is configured to be pre-receiving, up-stretch, access, drawback, transfer, inventory and end-of-life processes: Who initiates, who reviews, when updates the inventory and what needs to be noted. Inventory alerts should also match the procurement cycle and actual consumption, and not just a single value. For maintenance emergency items, there is a distinction between criticality and how the goods are replenished; parameters should be identified by equipment, storage and procurement-related positions.

The system is run by a few real, controlled operations that are best used to perform exercises to check whether the documents trace back to material, quantity and operation time. If inventory changes do not coincide with field operations, check the process nodes and posts first, and do not attribute problems to software alone.

We'll start the line in stages, and we'll use the check results to determine the rhythm.

The implementation can start with a warehouse or type of spare parts, starting with the basic file and opening inventory, then running a test run for delivery, and receiving and withdrawing high-frequency (HF) processes such as repossessing. During the trial, the daily random check system inventory and physical records record the cause of the discrepancy; after differences have been reduced, then they are extended to other storage positions or types of operations. Each stage should identify the person responsible, the calibration and problem handling, and avoid one-time import before not finding fields or processes that do not apply.

The impact of landing is not only whether the system is accessible, but also whether material files are checked, access to the warehouse is registered in a timely manner, inventory discrepancies are recorded or not, and early warning supports the assessment of replenishment. For frequent maintenance fields and processes, fixed-time review should be arranged by the person responsible. It is easier for the spare parts management system to move from one-time to an ongoing daily tool by managing data quality, job operations and system rules.