How do RFID asset management labels be managed? Batch generation and issuance
The management focus of the RFID asset tag is not one-time writing, but rather to align the code, asset desk account, label physical and access records. It can be performed as a "Unified Code - Batch Card - Sampling Check - Issued by Person or Area - On-Site Tie"; lot numbers, numbers and responsible persons are kept in slots that facilitate inventory, re-disbursement and retroactiveization.
Element 1: Pre-coding rules before preparation of batch data
Before the batch is generated, make clear what each label corresponds to and whether the code is global. It is common to use asset numbers as business keys, RFID tag chips as label identifiers, which are linked in the billboard, not to consider label codes directly as all information about the asset.
Import data sheets suggest that at least asset numbers, asset names, label codes, use of departments, location of storage, label batches and distribution status be included. Asset numbers should be heavy, and field entries should be checked; if a number is required to generate tag encoding, the length of characters and rules should be defined in advance, and the version of the rule should be kept to avoid subsequent changes causing duplication or difficulty of identification.
Element 2: Generation by batch and recording of written parameters
Disassembly the pending label data by use or number, for example by grouping them by warehouse, department or single-claimer. Each batch sets the batch numbers, records the number of planned, actually writes the number, operator, date, label type and reading and writing device parameters. The specific parameter should be based on the compatibility requirements of the label chip, the reader and the application scene, and it is not appropriate to duplicate other project settings directly.
A small number of labels are tested for writing, confirming the code format, reading distance and data map correctly, and processing the whole batch. Batch write results are exported against import lists: success numbers, failure numbers and duplicate encoding numbers are checked. Failure tags are isolated, do not re-write without review to overwrite a valid tab.
Element 3: Control errors with a stamp and physical count
After the batch is completed, read the label code item by item and check the list; when the number is larger, add sample rechecks to the full-readable, with emphasis on checking the end-of-pipe label, writing the failed re-test label, and the labeled product with abnormal appearance. The scale of the sample can be set according to the size of the batch and internal quality requirements, and the number of random checks, the unusual type and the result of the process.
Shanghai-based Selecting Tech, when combing the RFID asset management process, separates “data validation” from “physical inventory”: the former confirms the code against the billboard, the latter confirms the number of labels, batches and states. This allows for a specific batch to be located in case of an leak or mistransmittance, rather than simply checking the entire inventory.
Element 4: Issued by List, tagging completed on site
The list of applications is generated by department, the recipient or installation area, and records batch numbers, labels, number of contacts and dates. The hands-on check the physical quantities and lists; if a split is issued, the original batch must be broken into traceable sub-seriess to avoid one batch record being multiple-to-peer but undifferentiated.
When the label is placed on an asset, read the tag and scan or enter the asset number on site to confirm that the two are tied correctly and then update the location and status of the installation in the billboard. In the case of warehousing equipment, the label attachment position should balance reading effects with daily usage, the metal surface needs to select the appropriate label type and test the reading after it is actually installed.
Element 5: Set-up change and re-issuance process
The account is at least written, written, issued, bound, disabled, and scraped. When re-send labels, do not directly repeat the old code; the reason for the old tag's expiry, the new tag code, the associated asset and the operator are recorded, and the change time is kept. The inventory shows that the label has been removed or abnormally read and write. The asset identification should also be checked first, and then replaced.
The daily management can be checked for unissued issuances on a monthly or inventory cycle, and the number of unbound and abnormal labels has been issued. Each batch generation and release keeps the original list and operational records, creating a traceable link from tag making to asset binding, and subsequent queries and back-up will be clearer.

Ms. Lei
Mr. Pang