Introduction to RFID applications in construction
The RFID applications in construction work can involve personnel, tools, materials and components, but the layout of the site, the operational phase and the subject of responsibility change frequently.
The site identity management needs to be adapted to the continuous changes
The fixed reading area is effective at some stage and may fail after adjustments to the block, stack or channel. The system should record the point and the version of the rule, and the initial test conclusions cannot be followed for long periods.
The presence of a person does not amount to the completion of security training, and the arrival of material does not amount to a quality check-in or acceptance pass.
The area, team and material relationship at the site will change continuously. The code and permissions should be adjusted over time while preserving historical interpretation.
Public facility identification capacity needs to be linked to disposal capacity
The e-identity of a public facility helps to identify the target and maintain the record, but the discovery of a dangerous state usually requires a sense, inspection or other evidence.
Online rates are not a substitute indicator of the effectiveness of public services
An online device indicates the existence of a communication, but does not prove that the target is safe, mission accomplished or service available. Public facilities projects should measure identification, status detection, responsibility and disposal review separately, and identify what evidence supports each. If an alarm persists but no one handles it, increasing the collection may only increase the number of to-dos.
An easily ignored reversal.
The system is still on the line, and it does not represent deployment. The site layout changes should trigger a point review to determine who is responsible for notification and re-evaluation, and avoid the construction of digital models that are out of step.
Put your judgment in the real situation.
Retest the identification, clearance and handover records for re-engineering of access, contractual team changes and material return.
It is recommended that the alarms be checked for arrival on duty in accordance with the design exercise of the facility's failure to connect, mark damage, fault detection and maintenance review.
How many bases do you have to decide what's worth?
| Observation dimensions | Evidence to be retained |
|---|---|
| Facility identity | Interval of markings with geographical or archival locations |
| Shut the ring. | Discovery, billing, disposal, review traceable |
| Continuity of service | There is an alternative process for the break-off and equipment damage |
| This is the key trade-off. | Is there a high-changed field with the responsibility for maintaining the digital model on a continuous basis, not just as a model when it goes online? |
It's worth asking.
Is there a high-changed field with the responsibility for maintaining the digital model on a continuous basis, not just as a model when it goes online?