AGV Control System Integration (Reference Design)

Model: Reference Design

Picture of products from the ANV Control System Integration Program (reference)
Define commands, state feedback, and process interlocks between AGVs, conveyors, doors, elevators, and loading stations. Specify which actions belong to the fleet manager, onboard controller, and site PLC.

Solution Overview

Define commands, state feedback, and process interlocks between AGVs, conveyors, doors, elevators, and loading stations. Specify which actions belong to the fleet manager, onboard controller, and site PLC.

Commands and state

Agree on vehicle movement, pickup, unloading, docking, acknowledgments, and state definitions.

Equipment handshakes

Set the order of position confirmation, permission to transfer, completion, and departure signals. Define timeout behavior.

Interlocks

Coordinate access to shared equipment and keep its existing safety controls in the sequence.

Recovery

Record lost communications, missing position confirmation, timed-out actions, and operator interventions. Specify retries, reset, and takeover.

Deployment Workflow

  1. Confirm control responsibilities.
  2. Define messages and handshakes.
  3. Test normal sequences and timeouts.
  4. Verify recovery after loss of communication and intervention.

Conveyor transfers

Verify the arrival, permission, and completion sequence with both controllers.

Doors and elevators

Test request, grant, occupancy, and release signals, including interrupted sequences.

Implementation and Acceptance

Obtain equipment interface documents and identify the devices responsible for each safety function. Implement emergency stops and collision protection through appropriate safety hardware and control circuits.

This is a reference integration design. Scope, interfaces, deployment size, and performance depend on project requirements. The cover image illustrates an application and does not depict a delivered project.

Specifications

Control ObjectVehicles, PLC, transmission lines, doors and other on-site facilities
Communications agreementsIdentification by equipment interface
Process SignalIn place, permitted to operate, completed, released, etc.
Fault mechanismTimeout, retrying, repositioning and manual takeover
Record contentsCommand, reply, change of status and anomalies
Acceptance CriteriaHandshake sequences, locking borders and abnormal recovery.

Product Features

  • Directives and states: Define the instructions for vehicle operation, discharge and docking and give back a unified meaning of critical state to prevent inconsistent interpretation of different equipment.
  • (c) Handshakes of equipment: signals such as planned, allowed to be removed, completed and de-sited, clear confirmation by the parties of sequence and waiting for timeout.
  • Interlocking process: Coordinated conditions for shared facilities such as doors, elevators and transmission lines to determine the operational boundary in conjunction with the existing security controls of the equipment.
  • (c) Disability disposal: recording of communications interruptions, equipment not in place, time overruns and manual intervention events, design repositioning, retesting and taking over processes.