How much is an asset management system? Hardware, software and implementation cost dismantling
An asset management system. How much is it gonna cost?
For the first time, many people ask this question, what they think about is "how much software is going to cost," but in fact, an asset management system that really works, hardware, software, and the three items are stacked together, and any one of them counts less, and then there's a problem. A medium-sized manufacturing enterprise, with a budget of between 150,000 and 800,000, is usually on top of that, because it's so big because of the number of assets, the location distribution, automation requirements that determine which functions you want to pay for.
First look at the real cost structure: Why not just software money?
A common misconception is that the system is bought by buying a software, and it's used by an account. Asset management is unique because it's natural to deal with "physical" -- what kind of equipment is it, in which workshop, who is working, when it should be maintained, and this information must be collected from the physical world. So the software is just the brain, and you have to give the system eyes and hands.
In the more common way of splitting in the industry, a total of 30-40% of all inputs to an asset management system are software, 25-35% of hardware and 30-45% of implementation services. That is, it's not very meaningful to compare software offers for two manufacturers simply because the other two are often more expensive than software when we do budget assessments for clients. We usually start with a list of assets, layout of the site, current level of informationization, and then push these three percentages back to the top, otherwise the price reported is paper tiger.
Software costs: What is the fee, what is the difference?
The software component is most easily underestimated because it has a very large cost dimension, not simply "how much is the set."
By mandate:The traditional one-time buyout (permanent authorization) is now less and less, because the manufacturer is reluctant to go down for the old version; more mainstream is the annual subscriptions, the number of assets, the number of users, the annual fee. If the SaaS model is selected (the system is placed on a cloud by the manufacturer, you pay the monthly user fee), the lowest but the highest total long-term cost is spent in the first period; privatization deployments (the system is installed on your own server) are instead, the pre-prevalence, the long-term savings.
By module:The basic module typically includes asset desk accounts (i.e., a table of all assets), the return of the asset, an inventory, depreciation calculation, this is a standard; the upper class adds maintenance worksheets, procurement approvals, and a route inspection; and up is the RFID asset position (the system can use a radio frequency tag to put an "id card" on each asset, which the system knows in real time), interface with the financial system, the BI statement (which turns the data into a chart). Each layer adds up, there is a step at the quote table.
Price-term references:Under 50, the light demand within 500 assets is usually from 20,000 to 80,000 for a year of pure software; medium-sized projects between 500 and 5,000 assets are bought at one time at 150,000 to 500,000; group projects in more than 5,000 assets or multi-plant areas, with a startup of 500,000 in the software component, are common. This is only a reference range, depending on whether you want to standardize or customize the product.
Hardware costs: high-risk areas for explosive budgets
Many companies fail to account for hardware at first, and they do not find a lot of what needs to be filled until halfway through.
- Servers and networks:If privatization deploys, a medium-sized server is about 30,000 to 80,000; the multi-plant area also needs VPN, or cloud-specific lines, which range from 10,000 to 50,000 per year.
- Collector terminal:includes handheld barcode scanners, PDAs (small industrial tablets with scanners that staff carry through the warehouse during stocktaking), and dedicated stocktaking terminals. Basic scanners cost a few hundred yuan each. Industrial PDAs cost CNY 2,000-6,000 each, and a plant-wide stocktake may need 5-10 units.
- Identification of the material used:Each asset needs a barcode label or RFID tag. An ordinary barcode label costs a few fen, while an on-metal RFID tag designed to work on metal equipment typically costs RMB 2–10. A business with 3,000 assets can spend nearly RMB 10,000 on printing tags alone.
- Positioning and Sensory Devices:This is the easiest part of the budget. If you want to get real time positioning (know which shelf, where each device is located in a warehouse), you need to lay out the base station, place it on a label, and 200,000 starters per plant are industry normal. Sensors monitor temperature and humidity, vibrations, tilts, etc., such as servers in rooms, museum displays, demand varies greatly.
When we do the project budget, there is a principle that "hardware follows business": first think about what kind of particle size you're going to have, whether you have only on the books or at any time know which workshop the bed is working. Only the former, two-dimensional barcoded guns, and the latter, if you want, are worth paying for the positioning system.
Implementation costs: the easiest to underestimate and the easiest to decide on success or failure
The implementation costs are the deepest one hidden, and the easiest part of the client to cut prices and then have to make up for it. It contains at least four things:
The demand research and process combing:Draws out the existing asset management processes of clients, and looks at which links can be standardized and which must be customized. This part accounts for 15 to 25 per cent of the implementation costs. A 200-person factory, which is a pure research process, typically takes 1-2 weeks, and the daily cost of a senior consultant (a day's work-in-a-day price) is between 2000 and $5,000.
System configuration and development:Standardized products are on line, running in a week or two; if you have to customize the approval stream, customize the report, and integrate single-point login (with micro-mails or nails) then you write code, which is charged per hour. Custom development costs between $30,000 and $80,000 for each input of 10 person days.
Data migration:Moves Excel or the old system's asset data into the new system. Don't underestimate this -- many businesses have accumulated assets from years of time, code rules are confusing, fields are incomplete, photographs are missing, and cleaning these data is often longer than the go-live system itself.
Training and running on the line:Train administrators, asset specialists, and shop-floor supervisors separately, with sessions lasting 2-6 hours each. The first month after go-live usually requires an implementation consultant on site or available remotely. If quoted separately, this costs CNY 15,000-40,000 per month.
When Shanghai-based Sieve Technology is implemented for manufacturing-class customers, data governance and process combing are usually as important as system configuration because the table is not regulated, the back account counts, maintenance, depreciation is all unreconciled, and the savings from the previous period will become several times the cost of returning to work.
How do you estimate the budget without stepping on it?
Small (up to 500 assets, single plant area):The total budget is between 50,000 and 150,000. SaaS pays + bar-coded guns + standardized, so this area solves 80% of the problem. Buy RFID and locate if you do not come up.
Medium (500-5,000 assets, possibly multi-plant):Total budget: RMB 300,000–1 million. Includes private deployment, industrial PDAs, some custom development, and full implementation services. This is the most common range in manufacturing and the one where providers compete most intensely.
Large (over 5,000, multi-business areas):The total budget usually starts with 1.5 million, without a clear ceiling. Besides software, hardware, implementation, it also involves an ERP (enterprise resource planning system, management of finance, procurement, inventory core system), EAM (business version of enterprise asset management system), financial systems in depth integration, and each additional interface, it is 50,000 to 200,000 more.
How do you judge water when you're offering?
After the quotations, there were three actions worth doing:
First, to have the manufacturer clearly list the costs of software, hardware and implementation, rather than just one package price. Too much of a pack often means that a certain fraction is covered up.
Second, ask for the next annual fee: User number expansion, new modules, upgrades, how to collect support after sale. Some projects have 200,000 in the first year, 600,000 in the second year, and that's where the problem is.
Third, the implementation team was required to set out a specific daily input and fielding plan, which would be much more credible than the oral commitments.
The asset management system is not a one-time consumption, it is a long-term tool. It is recommended that you leave 10% to 15% of the flexibility space in the budget phase for optimization and expansion over the previous two years, which is more rewarding than putting too tight a budget card on the line.