Application of RFID in asset management
The RFID asset management enables the tracking of the complete machine, component or container, and selects which layer should be determined by responsibility, value and maintenance actions rather than a single label for all items.
Asset applications should first select the most manageable particle size
High-value undisable parts may require an independent identity, while low-value consumables may require only batch management.
Automatic collection is difficult to create reliable operational events when the particle size of the account does not match the size of the field operation.
The more the particle size is managed, the more the input is usually given to labelling, maintenance and review. Priority should be given to fine-species management of objects whose value is high, frequent flow or difficult to identify.
How do border conditions change the conclusion?
If an enterprise simply needs to know whether a certain set of tools is complete, it may be too heavy to create complex asset approvals; if key tools are easily lost, the whole set of tracking can be too thick. The particle size should match decision-making and risk, rather than defaulting on more or less professional. Moderate design can also reduce the long-term data maintenance burden.
It's recommended that this be verified.
Select assets that are dismantled, borrowed and scrapped to check whether each change occurs at a level that the system can express.
It is recommended that a realistic baseline be established for a group of assets, followed by a loan, movement, maintenance and end-of-life arrangement. The system should allow for discrepancies to be detected, evidence to be reviewed and adjusted with authorization, rather than allowing new scanning results to cover all history directly.
Assets can be found and responsibilities and status are required to be explained
The fixed assets account should separate the asset identity, custody responsibility, physical location and life-cycle status. Labeling can reduce collection costs, but does not automatically address such management issues as unrecorded and undiscounted transactions.
Don't let the new observations cover the original responsibility without preconditions.
The physical inventory reveals a lead on the ground, and the billing contains an approved fact of responsibility that may be temporarily different. Automatically updating the custodian or writing off assets directly with unread results can override the necessary judgement. The system should generate differences, link evidence, adjust through clear authority and retain the previous status. The difference is not a dirty data that must be eliminated immediately; it may be just what the organization needs to see before the facts are verified. It is more meaningful to manage the difference than to keep the interface straight.
How many bases do you have to decide what's worth?
| Observation dimensions | Evidence to be retained |
|---|---|
| Concordance | Undisclosed, unincorporated and abnormally separated. |
| Continuity of responsibilities | Loans, restitution and transfer are retroactive |
| Quality of write-offs | End-of-life or change of bid does not result in duplicate assets |
| This is the key trade-off. | Is the more detailed asset tracking, the better it is, or should it be so long as it can change a management decision? |
It's worth asking.
Is the more detailed asset tracking, the better it is, or should it be so long as it can change a management decision?

Ms. Lei
Mr. Pang